So, here's the thing, I recently finished 2 1/48 Citations both with home grown decal design and production, a couple of weeks ago I pulled out an Airfix HS125, then the Matchbox kit to see what I had to do to achieve a Qantas or Department of Civil Aviation example.. the answer was Airfix albeit with modification. As I had the Matchbox one out now I thought what the hell I'll do that one too and found out what mods were required to do a 700 series (Garrett Fans), so here is where they are now with the umpteenth application of filler.
I am undecided on what the 700 is going to be.. it may well end up being DCA's second HS125 VH-JFT
Both of these models need lot of work, I messed about with the Airfix engine pods to make it look a bit more like the real thing, reduced the size of the underbelly fairing and other bits and pieces. Both require modified windscreen framing as the kits look nothing like the real ones..rounded corners on the panes are going to be a "pain".
Now the elephant in the room you ask? well the elephant is what drove me to start 4 business jets in the last couple of months (thinking they were going to be easy builds HAH!)
The elephant is this 1/72 AMT EC-135, it has been in the stash for years and it is one I dearly want on my shelf as I provided ATC services as a RAAFie and a civvie to this airframe several times over a couple of decades. I wanted her in takeoff configuration so I cut out the flaps, put the slats / slots in, made up the wing fairing flaps and cut out the krueger flaps on the leading edge..absolute bloody madness.. the kit is a complete pig without these modifications and each hurdle drove me to start an easier kit or two! Work continues slowly on pachyderm and I am getting close to doing its final prime then paint before I start putting the engines and flaps on (the pylon to wing joints are rubbish and will require much filling but I figure painting the bottom of the wing at least first is the way to go. It is 8 weeks before we leave for the UK, I want it finished by then. The Airfix HS125 has to be done by expo. No rush on the Matchbox but it would be nice to finish that too. Then there is the SM82 to SM75PD conversion half done in the box, be nice to finish that too but I need to vacuform a new windscreen / canopy. The heat is on.