Been flat out with this over the past fortnight which will be my new modelling office. The sparky was in today and put in three double power points, a quad and fitted the flouro. Had to give the home feeling by fitting the TV in the corner.
I'm looking forward to lining the walls and building the new cabinets and storage facilities. Have ordered a spray booth so hopefully that'll get set up in there too at some point. I went to Bunnings yesterday and found a small wall hung ceramic heater which actually looks like a split system A/C unit and blows cool air to, so hopefully with the cooling tower fan I have will be enough for the summer.
Will post images as I progress. Waiting for the slab to go in on Wednesday.
On a serious note, the floor went in today and looks exceptionally good.....just can't walk on it till Sunday. Might start preparing other things for it though.....such as the fridge, desk, storage cupboards........
I have to apologise guys for my lack of attendance on the site, but as I mentioned to Ray the other night I have been dealing with the internal renovations within the house and really haven't had much time on any of the sites except for some brief periods whereby I've had to use my phone. Haven't managed to get a phone link for ACAM as yet via Google. Anyway, I thought I'd show you some updates to the shed. It's a long way from being properly fitted out as I still haven't sanded back the plaster putty but it gives you an idea of where I'm at. I also received a 42lt bar fridge for the shed from the family for Father's Day which I need to now stock. If it wasn't for the crap weather tonight in Melbourne I probably would've actually done some modelling.
DSC_0162.JPG (159.94 KiB) Viewed 6511 times
DSC_0161.JPG (131.05 KiB) Viewed 6511 times
DSC_0160.JPG (122.38 KiB) Viewed 6511 times
This was two bouts of hail in 20 minutes in Rowville (Eastern Melbourne suburb in foothills of Dandenongs) at about 5.45pm. If you didn't know you could say it was snow. Chris is standing outside my place with the green Colorbond roof. Most of the hail is still sitting there un-melted as at 8.00pm.
Looking great A2. That's come up really well Our place in Boronia had 4 lots of hail in 2 1/2hrs this arvo so the Boss says. She sent me some pics that were very similar to yours. At least it wasn't very big hail is all I can say
Head A/CAM Phantom Phanatic, Shit Stirrer and Karma Bus Driver toot fkn toot